An estate owner needs to decide which roofs to fund first and which packages can sensibly be procured together. Start with a consistent record for each unit.
Give each unit the same short record
List the roof type, approximate area, known condition, water-entry history and available survey evidence. Add lease dates, access windows and operational consequences. Record information gaps so a well-documented unit does not automatically outrank a poorly documented one.
Compare priorities before combining packages
A unit with repeat disruption may need attention sooner than one with a convenient access window. Consider shared gutters, interfaces, yards and deliveries. Ask which dependencies would make separate appointments difficult.
Obtain decisions at unit and estate level
Issue a common specification where appropriate and request prices by unit. Separate shared setup costs. Ask for the programme effect of adding, deferring or separating a unit so the owner can phase the investment.
Compare two adjacent units
Suppose two units share a yard. One roof has higher priority, but access for both depends on the same tenant. Request a price per unit and a separate shared setup allowance. If the owner defers one unit, the remaining cost is still clear.
- What makes each unit a priority?
- Which access and drainage arrangements are shared?
- What changes if one unit moves to the next budget year?