Rooflights affect the covering, the programme and the people working below. Decide how tenderers should treat them before comparing prices.
Give each rooflight a location
Mark the rooflights on a roof plan and identify the spaces below. Include survey photographs, known product details and occupier concerns about light, glare or water entry. Flag the information that still needs checking so bidders can identify assumptions.
Ask for comparable options
Where retention and replacement are both under consideration, ask what each option includes at the perimeter. Clarify who confirms compatibility with the proposed covering and the details the system requires. A blanket allowance can hide differences in size, form and access.
Coordinate the work below
Agree which areas can be released and when. Ask bidders to describe temporary protection and sequencing. At Portsmouth Dockyard, Premierseal replaced Georgian glass rooflights within a pitched roof renewal on a site with restricted access.
Build a rooflight schedule
Give each rooflight or repeated group a reference. Record the unit beneath it, verified dimensions, condition and whether retention or replacement forms the base price. Request an alternative where the client has a choice.
- Which rooflights does the base tender cover?
- Who verifies the perimeter detail and its interface with the roof?
- When is access available beneath each group?
Related service: industrial metal roofing.